C.
If equipped with Elect-A-Heat option, remove the
heater assembly from the ceiling assembly chute.
Position the heater assembly in the heat pump return
air opening as shown in Figure 10. The heater
bracket must be installed over the metal basepan
extrusion and positioned between the basepan and
the plastic drain pan (See Figure 11). Tighten set
screw to secure the assembly so as to prevent
movement.
D.
Fasten the duct collar to the basepan of the heat
pump with three (3) screws (See Figure 14).
E.
Plug the roof top heat pump electrical conduit into
the 9 position receptacle located in the thermostat
side of the ceiling assembly. If installing an Elect-
A-Heat equipped ceiling assembly, plug the heater
cord into the 2 position receptacle (See Figure 12).
F.
Install the provided cable clamp in the 7/8" dia. hole on the
back of the metal field wiring box. Insert the supply wiring
through the cable clamp and into the field wiring box so that
4 - 6" of supply conductor is inside the box. Secure the cable
clamp over the supply wire sheath so that no movement is
possible (See Figure 13).
G.
Connect the supply power conductors to the black
and white pigtail wires and the supply ground wire
to the green pigtail wire found in the field wiring
box using the 3 provided wire nuts. IMPORTANT -
Connect the black supply to the black pigtail and the
white supply to the white pigtail. Using a U.L.
approved electrical tape, secure the wire nuts to
wires in a workmanlike manner (See Figure 13).
H.
Place the metal
over the thermostat,
field wiring
Make
that
wires
pushe
the
ol
or
in
wir
betwee
thermostat
and will not be
box shield. Control
installed when the two holes in the shield are aligned with the
All manuals and user guides at all-guides.com
control box shield
switch and
boxes.
certain
all
are
d into
contr
boxes
laying
the
eway
n the
and switch boxes
pinched by the control
box shield is properly
two screw holes in the ceiling assembly chute (See Figure 12).
I.
Raise the ceiling assembly and secure to the
mounting frame with 4 provided shoulder
screw/spring assemblies. The front two screws
should pass through the clearance holes in the metal
control box shield (See Figure 14).
J.
Pull the fabric duct material through ceiling
assembly discharge opening. Peel the release liner
from the adhesive strip around the discharge
opening. Press the fabric duct material firmly in
place around opening. Cut off excess fabric on
inside of ceiling assembly chute with a box knife
taking care not to tear the fabric beyond the adhesive
strip.
12