Steelcase west elm Greenpoint Benching Instructions De Montage page 39

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

®
Assembly for New York Power-In Feed
(continued)
3
. Locate junction box 6" inward from the end
of the worksurface. Align box and pre-drill holes for
#10 screws, (#22 drill bit).
4.
Attach the box with screws provided.
5.
Drill pilot holes for strain relief brackets. Attach the harness
strain relief bracket to the bottom side of the worksurface with
screw provided (5a). Insert harness into the bracket (5b) and
secure harness with nut and bolt ( 5c). Connect the modular
end of the harness to the first modular power block.
Attach electrician supplied harness strain relief bracket in
location shown. Follow steps 5a - 5c to secure electrician's
harness.
6"
STRAIN RELIEF
BRACKET
Page 39 of 53
Doc # 142344 Rev F

Publicité

Table des Matières
loading

Table des Matières