Télécharger Imprimer la page

Wellis Divido ACS0190 Guide D'installation page 5

Publicité

Les langues disponibles

Les langues disponibles

2 Testing procedure
1.
Open the water
supplyvalve to check
whether any leaking
from any connection
parts.
3 Sealing wall
1.
Make sure no leaking
after the test mentioned
above, then seal the
E-box and the water
pipe with cement.
3.
Tiling. Try to narrow the gap between
the protruding E-box and the tile. It is
critical for installing the control valve
later.
2.
Disassemble the
sealing board from
the embedded body
with the provided Allen
Key.Remove the two
sealing rubber plugs
from the body. Then re-
install the sealing board
with the Allen key.
Important: make sure the
protruding part of E-box is
perpendicular to the surface
of the wall. It is critical for
putting tile on the wall.
4.
3.
Open the water
supplyvalve for a few
minutes in order to
flush all the mud and
sand in the pipes.
90°
2.
Glue the plaster guard
around the protruding
E-box to protect the
wall around the E-box.
After tiling, cut the protruding part of
the E-box. Then we have finished
the installation of the E-box. We can
continue the installation of the control
valve now.

Publicité

loading

Ce manuel est également adapté pour:

Divido acs0191