Installation guide
EN
1 Installation guide
1.
NOTE: The E-box is
pre-set for four-function
control valve. For three-
function control valve
installation, please plug
one of the water outlets
with nut as shown in
the diagram before
installating the E-box.
4.
Connect the inlets of
hot and could water
pipes as well as other
function water pipes to
the E-box, tighten with
wrench.
2.
Drill the installation hole
referring to the drawing
of the hole provided.
Then drill 4 positioning
holes according to the
positioning marks.
5.
If the wall is not solid, but cavity wall. Please install
a supporting stand for the E-box referring to the
drawing. Then fix the E-box to the wall with self
tapping screws.
3.
Put the E-box into the
hole drilled and fix
the E-box with 4pcs
of expansion screws.
Before tightly fix with
wrench, please adjust
the E-box to make sure
that it levels with the
ground.