Faber e-MatriX heat 800/500 I Manuel D'installation page 27

Masquer les pouces Voir aussi pour e-MatriX heat 800/500 I:
Table des Matières

Publicité

Installation manual e-MatriX heat 800/500 I,II,III and e-MatriX heat 800/650 I,II,III
4.2
Placing the fire
Please note!
Always the fire must be fitted with back to
a wall.
The fitting of a chimney breast is
mandatory.
For a proper functioning of the fire,
always ensure that the fire is levelled.
Floor standing
Place the fire in the correct position and fix it to
the wall, see fig. 1.1.
Hanging on the wall (fig. 1.2)
The fire can be mounted on the wall using the
optional wall bracket "A" (see also dimensional
drawing in chapter 12.6). Use the distance holder
"B" for vertical leveling. Remove the existing
brackets, see fig. 1.1.
4.3
Installation and finishing (see fig. 1.0)
With cover strip "A"
Built the false chimney breast or plateau against
distance holder "B".
Without cover strip "A"
Please note!
At the e-MatriX front glass only versions, the
cover strip is fixed by screws, remove those
first, see fig. 1.3.
Remove distance holders "B" from the fire. Built
the false chimney breast or plateau against
distance holder "C".
4.4
Control box (see fig. 4.0)
 Please note!
Fix the Control box at an accessible location
behind the service door, see dimensional
drawing 12.5 and 12.7.
Electric connection
Use the supplied extension cable to
connect the Control box to the Engine, see
fig. 4.0-B.
Direct the DC cable, inside the Engine, to
the Control box and connect it, see fig.
4.0-A.
o
Max. cable length from the
center of the fire to the left is
1,5m.
o
Max. cable length from the
center of the fire to the right is
1,0m.
26 <
<
<
<
Connect the supplied mains lead, see fig.
4.0-C.
If desired, an extension set of 2m is available!
(The existing cable length will be extended by 2m,
item number 20901478).
Water connection
This appliance is equipped with the following
(overflow) protections:
-
Electromechanical valve in the Control
box that is controlled by sensors in the
water tank.
-
Absorption valve in the Engine that kicks
in when the water sump has an
unexpectedly overflow, see fig. 5.0-K.
Connect all parts according flow diagram,
see fig. 5.0.
Place the water filters at an accessible
location in correct alignment, there's a
"flow" direction marking on both filters.
 Please note!
Carry out a performance test, see chapter 8
and check all connections for water leakage
before placing the fuel bed and front glass.
4.5
Built-in structure
The construction may not rest on the fire.
Keep a minimum distance of 10mm
between built-in frame and false chimney
breast when using combustible material,
see fig. 1.4.
Take into account a minimum distance of
2mm due to expansion of the fireplace,
see fig. 1.4.
Take into account the thickness of any
finishing layer!
Ventilation
The e-MatriX needs a minimum free space
of 50mm above the fire.
The e-MatriX needs a minimum
ventilation of 210cm² underneath the fire.
5
Removing glass
5.1
Front glass (e-MatriX front glass only)
Remove the cover list, see fig. 2.0a.
Rotate both glass clamps clockwise, see
fig. 2.0b.
Place suction cups and remove the front
glass see fig. 2.0c.

Publicité

Table des Matières
loading

Table des Matières