Télécharger Imprimer la page

Calorex AW629 Mode D'emploi page 24

Publicité

Les langues disponibles
  • FR

Les langues disponibles

START UP PROCEDURE AFTER WINTERISATION
1. Replace covers (if not fitted).
2. Remove front grille .Using a soft brush clean finned surfaces of heat pump. Replace panel.
3. Remove plastic covers on water connections and reconnect water piping or close drain valve.
4. Start up water circulating pump and leave running for at least 1/4 hour to establish flow and enable any air
in piping to escape.
5. Replace fuses to heat pump circuit.
6. Switch on heat pump.
7. Check control thermostat is set to required pool temperature.
8. Check pool water daily to ensure it is at correct pH and has correct chemical balance. See Section 3
Plumbing.
Page 24

Publicité

loading

Ce manuel est également adapté pour:

Aw829