1. Pump groups UC (unmixed circuit)
Technichal data
DN:
20
Top connection:
3/4" FI
Bottom connection:
Pump:
Axial separation:
Components of:
Dimensions:
Sealing materials:
Temperature range:
Operating temperature:
Operating pressure:
kVs values:
8.5
2. Pump groups MC (mixed circuit)
Technichal data
DN:
20
Top connection:
3/4" FI
Bottom connection:
Pump:
Axial separation:
Components of:
Dimensions:
Sealing materials:
Temperature display:
Operating temperature:
Operating Pressure:
kVs values:
6
3. Installation
1. Connect the pump group, including the insulation, to the existing pipe installation.
2. Tighten the fixations by hand.
3. Mark the bottom and the middle of the case. Subsequently remove the compact distributor again, according to ISO.
4. Drill holes into the wall according to the markings and insert wall plugs.
5. Mount the bottom case by using the screws and washers supplied.
3.1 Installation of flowmeter
The pump groups UK, MK are also available as variants with flow meter inserts (UK-Z, MK-Z).To install the flowmeter, replace the telescope
piece and use the probe sleeve 1/2". Please follow the installation instructions for the flowmeter.
Dimension: 3/4"
90-110 mm
1"
90-130 mm
Effiziente Energietechnik
25
32
1" FI
1 1/4" FI
1 1/2" MI (flat-sealing)
see ref. number
125 mm
Steel, Brass, EPP insulation
ca. H 420 x W 250 x D 255 mm
PTFE asbestos-free fibre washer
0° up to 120°C
up to 110°C
PN 6
9.7
11
25
32
1" FI
1 1/4" FI
1 1/2" MI (flat-sealing)
see ref. number
125 mm
Steel, Brass, EPP insulation
ca. H 420 x W 250 x D 255 mm
PTFE asbestos-free fibre washer
0° up to 120°C
up to 110°C
PN 6
6.2
6.4
See Fig. 8
see Fig. 1 and Diagram Fig. D1
Fig. D1
A
Volumetric flow - pressure loss
diagram Pump group UC
B
Pressure loss (bar)
C
Volumetric flow (l/h)
see Fig. 2 and Diagram Fig. D2
Fig. D2
A
Volumetric flow - pressure loss
diagram Pump group MC
with 3-way T-mixer
B
Pressure loss (bar)
C
Volumetric flow (l/h)
see Fig. 3
11