Télécharger Imprimer la page

Airwell FWDB Floor ceiling Manuel D'installation page 24

Publicité

Les langues disponibles

Les langues disponibles

E.Install dimension requirements for outdoor unit
In order to ensure the unit to run well, in the choice of installation location, the following guidelines must
be followed:
1. Upon installation of the outdoor unit, the air discharged outdoor should not return, and enough space
for maintenance must be remained around the machine.
2. The ventilation must be excellent in mounting points, so that the machine can intake and discharge
sufficient air.
which block the air flow.
3. The installation location is strong enough to withstand the weight of the outdoor unit, and has the
effect of sound insulation and vibration reduction.
will not affect the neighbors.
4. Avoid direct sunlight, it's best to put up an sunshade for protection.
5. In the mounting position, rain and defrost water must be drained.
6. In the installation position, it must be ensured that the machine will not be buried in the snow, and not
subject to the effects from garbage and mists.
7. In the installation position, it must be ensured that the air outlet is not facing the strong wind.
4.Installation guide
Make sure there are no obstacles for air inlet and outlet; if exist, remove obstacles
And to ensure that outlet air and noise of the unit
20

Publicité

loading