Télécharger Imprimer la page

Tripp-Lite BP Serie Manuel De L'utilisateur page 5

Masquer les pouces Voir aussi pour BP Serie:

Publicité

Les langues disponibles

Les langues disponibles

Mounting (Rack)
2
Secure the shelves
and cup washers
• For 2U equipment mounting, place 4 screws total at the front and 4 screws total
at the back.
• For 3U equipment mounting, place 6 screws total at the front and 4 screws total
at the back.
Tighten all screws before proceeding.
Warning: Do not attempt to install equipment until you have inserted and
tightened the required screws. The plastic pegs will not support the weight
of your equipment.
2U
2
3U
2
18-09-336 93-36FF.indb 5
B
to the mounting rails permanently using the included screws
C
as shown.
B
C
B
C
5
C
C
12/18/2018 8:26:58 AM

Publicité

loading