3. Installation

3.1 Dimensions

3.2 Installation pipework kit

7305802-06 09.15
Risk of electric shock! Isolate the system from the power supply!
Prior to commencing any installation work, isolate the boiler from the power sup-
ply and safeguard against unintentional reconnection!
Danger! Installation work only be installed by trained contractors!
All work must only be carried out by trained contractors and commissioned by a
competent person appointed by the system installer.
The installation instructions of wall boiler and storage are to be observed.
Risk of burns! Let the boiler cool-off before installing the accessories!
Fig. 1: Dimensions WHBS
Fig. 2: Installation of pipework kit UVS WHBS
1. Disconnect the boiler from the heating network by shutting-off the valves
Pipework kitUVS WHBS
Installation
13
GB