Intended Use Of The Heat Pump; Intended Purpose; Operating Principle; Basic Device - Dimplex SIW 6TES Instructions D'installation Et D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

2
Intended use of the heat
pump

2.1 Intended purpose

The high-efficiency compact brine-to-water heat pump with built-
in domestic hot water cylinder is intended only for heating water
and process water. It can be used in new or existing heating sys-
tems. The mixture of water and frost protection (brine) acts as a
heat transfer medium in the heat source system. Ground probes,
ground heat collectors or similar systems can be used as heat
source systems.

2.2 Operating principle

The heat generated by the sun, wind and rain is stored in the
ground. This heat stored in the ground is collected at a low tem-
perature by the brine circulating in the ground heat collector, the
borehole heat exchanger or a similar system. A circulating pump
then conveys the "heated" brine to the evaporator of the heat
pump. There the heat is given off to the refrigerant in the refriger-
ating cycle. This cools the brine so that it can once again absorb
thermal energy in the brine circuit.
The refrigerant is drawn in by the electrically driven compressor,
compressed and "pumped" to a higher temperature level. The
electrical power needed to run the compressor is not lost in this
process. Most of it is absorbed by the refrigerant.
The refrigerant subsequently passes through the liquifier where it
transfers its thermal energy to the heating water. Depending on
the set operating point, the heating water is thus heated up to a
max. of 62 °C.
www.dimplex.de
3

Basic device

3.1 General

The basic device consists of a ready-for-use heat pump for in-
door installation in a compact design with built-in domestic hot
water cylinder.
All components required for the operation of the heat pump are
located on the switch box with heat pump manager. An outside
temperature sensor including fixing accessories and a dirt trap
are supplied with the heat pump. The supply for the load current
and the control voltage must be installed by the customer.
The customer must provide both the heat source system and the
brine circuit manifold.
1)
Brine-to-water hydraulic module
2)
Switch box with heat pump manager
3)
Heat pump module
452236.66.05 · FD 9606
SIW 6TES - SIW 11TES
EN-3

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Siw 8tesSiw 11tes

Table des Matières