Sulzer EWK 036 Mode D'emploi page 10

Table des Matières

Publicité

English - Inglés - Anglais
– Water connections: The water inlet connec-
tion is located on the upper part of the
tower. Other connections (outlet, overflow,
make-up water and drain) are located in the
lower part of the collecting basin. The water
inlet connection (distribution duct) is fitted
up in its closed end with a threaded sleeve,
closed by a plug. To make the necessary
controls, a pressure gauge is fitted in this
sleeve to monitor the circulation pressure
and flow. To avoid the overflow of water
from the collecting basin, due to any fault in
the float valve, a connection for an overflow
duct is fitted. It is advisable to fit up a pipe
with stop valve in the drain opening, lea-
ding the water to the closest drainage
channel.
Français - French - Francés
– Connexions d´eau: La connexion de la
tuyauterie d´entrée de l´eau se trouve située
dans la partie supérieure de la tour. Les
autres connexions (sortie, déversoir, eau
d´appoint et vidange) sont montées dans la
partie inférieure du bassin ramasseur. La
tuyauterie d´entrée de l´eau (tuyauterie de
distribution) est pourvue dans son extrémi-
té aveugle d´un manchon à vis, fermé avec
un bouchon. Pour effectuer des contrôles,
on monte dans ce manchon un manomètre
grâce auquel on détermine la pression et le
débit en circulation. Il est prévu la conne-
xion d´une tuyauterie de déversoir pour évi-
ter que l´eau déborde du bassin ramasseur,
dû à n´importe quelle déficience dans la
vanne à flotteur. Dans la bouche de vidan-
ge il convient de monter une tuyauterie,
avec valve de fermeture, qui donne sur la
tuyauterie la plus proche du canal d´écoule-
ment.

Publicité

Table des Matières
loading

Produits Connexes pour Sulzer EWK 036

Table des Matières