Fig. 3: Smart Dose II Rack Installation
1
Turbo DOSE 2 Controller
2
Pump valve on the pressure side
3
TurboSmartPump II head made of PP
4
Pump valve on the prime side
5
PTFE metering hoses on the pressure side
6
Main switch
7
Rotary switch for the voltage supply
8
Solenoid valve
9
Water connection
Please go over the installation check list listed in the following chapter with the Ecolab
technician and your Ecolab field rep employees. Please document the fact that you have
accepted the delivery by signing your signature on both of the attached check lists
Ä Chapter 12 'Installation Check List' on page 51. The second copy/version shall be
kept on file for you in the documents file at Ecolab. This guarantees that your installation
data is readily accessible at any time, and, in the event of a complaint, ensures that the
process cycle for handling your complaint flows smoothly.
10 Flow monitor
11
Product delivery into the manifold
12 Open pump connections for a pump kit that is available
as an option
13 Outlet from the manifold to the equipment / metering
output
14 TurboSmartPump II
15 Splash guard with reinforcement ring
27
Installation
417102260 Rev. 4-02.2019