Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6

Start-up

Personnel:
The following points must be checked and/or followed at start-up:
n
Wall structure must be strong enough for mounting.
n
Rinse out the fresh-water line well before connecting the unit.
n
Check to make sure that all components and hose connections are leak-proof.
Tighten screw-on connections, if necessary.
n
Check the controller function and the remaining components (pumps).
n
Check that the spray protection curtain has been properly assembled.
The equipment must not be operated if the spray protection curtain has not been
assembled.
n
Mechanic
n
Qualified electrician
n
Service personnel
n
Specialist
29
Start-up
417102260 Rev. 4-02.2019

Publicité

Table des Matières
loading

Table des Matières