Installation Check List
12.4

Electrical installation

Check list
Bridges in the controller set independent of the signal strength
Screened cable at signal voltages of 12 – 90 volts?
Voltage supply, signal cable and empty messages free of
tension
Electrical socket safeguard installed and inspected
Network cables / installed free of tension
12.5

Controller Setup

Check list
Pump calibration values stored
Post-rinse or rinse activated
Wireless duct adjusted for multiple controller installation
Selection of action selected according to end of program
12.6

Mechanical Function Test

Check list
Possible to manually activate pumps
Suction process of product stated
Line and component checked for watertightness (pumps, MV,
SGL, manifold)
Acoustics check for atypical noises
12.7

Electrical Function Test

Check list
Function of main switch stated
Signal input on controller checked (Controller via test screen
on the controller is an option)
Double handle on the program selection box reinitializes the
controller (this only applies to installations that include the
program selection box)
Function for the connected empty signal stated
Function for the connected flow monitor stated
Reinitializing the controller and program selection box stated
Sends to and receives from the controller
417102260 Rev. 4-02.2019
Yes
No
Yes
No
Yes
No
Yes
No
52
Note
Note
Note
Note