Télécharger Imprimer la page

Handling And Installation; Transport And Unloading; Installation; Foundations - CLAS PE 2002 Mode D'emploi

Pont elevateur 2 colonnes symetrique 5t passage haut 3870mm 2.6kw

Publicité

Les langues disponibles

Les langues disponibles

PE 2002
4.0 HANDLING & INSTALLATION

4.1 TRANSPORT AND UNLOADING

WARNING: If not carried out with the utmost care, lift unloading, transport and lifting
operations can be dangerous: so keep all the unauthorised persons away from lift; clean,
clear and delimit the installation area; check that the lifting equipment are suitable for
use, in good operating conditions and perfectly efficient; do not touch any suspended
loads, and stay at safety distance; during transport, suspended loads shall not be more
than 20 cm from floor; thoroughly respect the following instructions; do not proceed in
case of doubts or uncertainty. After unpacking the different lift components, check for
any visible damages. In case of doubt, do not proceed with the assembly operation and
contact the manufacturer or the dealer.
For transport and volume requirements, the lift is shipped partly disassembled in its basic
components. The different components of the packed lift are kept together by means of suitable
bolted brackets to ensure easy and safe transport and handling. Packed lift shall be transported
with a fork lift having a suitable capacity. During handling, make sure that the packed lift or the
single columns are not subject to impacts or dashes. Packed lift overall dimen-sions and mass are
shown in Figure 8.
The packing items, plastic, polystyrene, nails, screws, pieces of wood, etc. are potentially
dangerous and should not be left within reach of children. These materials are not
biodegradable and should be disposed of in the suitable collection points.

4.2 INSTALLATION

WARNING:
All the following installation, adjustment and testing operations should be carried out
only by qualified and responsible staff operating according to the applicable electric,
hydraulic, mechanic and building safety standards.
DANGER:
The installation, the adjustment and the testing of the lift imply potentially dangerous
operations.
Therefore, all the instructions given below should be carefully read. In case of doubt,
please contact the Manufacturer. The MANUFACTURER disclaims any responsibility in
case of non compliance with the safety standards and with the accident prevention
rules given in this manual.

4.3 FOUNDATIONS

Lift shall be laid onto a reinforced concrete layer class «RcK 30» (3000 N/cm²) with a min. thickness
of 20 centimetres and spanning at least 1.5 m away from anchoring points. The concrete platform
shall be smooth and perfectly levelled in all directions, and cast on a compact ground. The overall
dimen-sions of the full system are given in Fig. 10.

4.4 POSITIONING AND INSTALLATION OF THE STRUCTURE

WARNING: At this stage of the installation, DO NOT perform any electrical connections.
AVERTISSEMENT : A ce stade, NE PAS effectuer les branchements électriques de
l'installation de levage.
66
PE 2006
PE 2007

Publicité

loading

Ce manuel est également adapté pour:

Pe 2006Pe 2007