6. Assembly
•
Check that all parts, necessary tools and safety aids are present (e.g. helmet, gloves, safety shoes).
•
Required tools:
- Rope
- Spirit level
•
Assemble the components following the steps shown in appendix T4 and T5
•
Make all the connections as shown in Annex T3
•
See the table below for the reference to the annex with the configuration table and configurations per type of rolling tower
EN
Configuration
RS TOWER 51
RS TOWER 51+/52
Configuration table and assemblies RS TOWER 51
Configuration table and assemblies RS TOWER 51+
Configuration table and assemblies RS TOWER 52
Configuration table and assemblies RS TOWER 54
Configuration table and assemblies RS TOWER 55
RS TOWER 54/55
6.1. RS TOWER 51 (75 cm rolling tower)
A. Base section
A1: Odd working height
1. Start with two 7 rung frames (part T2.A)
2. Place the wheels (part T2.C) in the frames, apply the brake and
point them outwards [T3.1 - T3.3]
3. Place horizontal braces (part T2.G) under the first rung on the
uprights [T3.4 - T3.5]
4. Place the Safe-Quick Guardrails® (part T2.F) on one side on the
upper rung with the instruction label facing inwards [T3.14 - T3.18].
5. Place a (temporary) platform without a hatch (part T2.E) on the 3rd
rung [T3.20 - T3.22]
6. Adjust the base section with a spirit level by turning the spindles
7. Mount the triangle stabilizers (part T2.I) [T3.9 - T3.13]
8. Place the 7 rung frames (part T2.A) and secure them
[T3.6 - T3.8].
9. Place the diagonal braces (part T2.H) (rungs 5-9)
10. Place a platform with a hatch (part T2.D) on the 7th rung
[T3.20.x - T3.22]
11. Climb through the hatch and sit on the platform with the legs
through the hatch and assemble the 4 horizontal braces
(part T2.G)
12. Remove the platform of the 3rd rung together with the
Safe-Quick Guardrails
13. Place the diagonal braces (part T2.H) (rungs 1-5)
B. Middle section
1. Place the 7 rung frames (part T2.A) and secure them [T3.6 - T3.8].
2. Place the diagonal braces (part T2.H) (rungs 5-9)
3. Place a platform with a hatch (part T2.D) on the 7th rung [T3.20 - T3.22].
4. Climb through the hatch and sit on the platform with the legs through the hatch and assemble the 4 horizontal braces (part T2.G)
C. End section
1. Place the 7 rung frames (part T2.A) and secure them [T3.6 - T3.8].
2. Place the Safe-Quick Guardrails® (part T2.F) on the upper rung with the instruction label facing inwards [T3.14 - T3.18].
3. Place a platform with hatch (part T2.D) [T3.19 - T3.22]
4. Enter the platform through the trap door and place the toe board kit (part T2.J) [T3.23 - T3.25].
28
www.altrex.com
Attachment
T4
T5
T6
T7
T8
T9
T10
T11
A2: Even working height
1.
Start with two 7 rung frames (part T2.A)
2. Place the wheels (part T2.C) in the frames, apply the brake and
point them outwards [T3.1 - T3.3]
3. Place horizontal braces (part T2.G) under the first rung on the
uprights [T3.4 - T3.5]
4.
Place the diagonal braces (part T2.H) (rungs 2-6)
5. Place a (temporary) platform without a hatch (part T2.E) on the
1st rung [T3.20 - 3.22]
6. Adjust the base section with a spirit level by turning the
spindles
7.
Mount the triangle stabilizers (part T2.I) [T3.9 - T3.11]
8.
Place the 4 rung frames (part T2.B) and secure them
[T3.6 - T3.8]
9.
Place a platform with a hatch (part T2.D) on the 7th rung
[T3.20 - T3.22]
10. Climb through the hatch and sit on the platform with the legs
through the hatch and assemble the 4 horizontal braces
(part T2.G)