Z30 SMART •
Z50 SMART • Z80 SMART Z120 SMART
4. MOUNTING AND INSTALLATION OF THE TANK
The mounting (4) of the hot water tank, as well as its connection to
the water (5) and electrical network (6) and commissioning must
be performed by a qualified professional according to our instruc-
tions and observing the standards IEC 60364 / MSZ HD 60364.
THE TANK MUST BE INSTALLED AND OPERATED IN A FROST FREE
ENVIRONMENT!
At the installation location, suitable electrical and water supply and sewage
system must be ensured, and before mounting,
the structure of the wall must also be checked
by an architect for compliance.
We recommend the following solutions for
mounting the appliance:
•
For stone, brick or concrete wall of
100-150 mm thickness:
50x5 mm (MSZ4342/DIN1017) flat steel rein-
forcement placed horizontally on the other
side of the wall. From the rear side, hexagonal
through bolts (M12 8.8, ISO4017/DIN933) and
wood construction washers (M12, DIN440R);
From the appliance side, M12 nuts (DIN934)
and washers (A13, DIN125) should be used.
• For thin walls:
On the rear side of the wall, vertically placed
60x30x6 mm U-shaped steel profile (MSZEN 10279/
DIN1026) should be used for reinforcement. From
the rear side, hexagonal through bolts (M12 8.8,
ISO4017/DIN933) and washers (A13, DIN125), and
from the appliance side, M12 nuts (DIN934) and
washers (A13, DIN125) should be used.
28
•
In case of improper connection and installation,
you will lose all your guarantee and warranty rights!
• Z150 SMART • Z200 SMART
9
9