Télécharger Imprimer la page

Franke KEP AC-SBF Serie Installation page 13

Publicité

Les langues disponibles

Les langues disponibles

SECTION 4: MOUNTING THE FRAME TO THE WALL
STEP 1:
Place rubber gasket on top of the cooler so it is centered left/right and against the wall. (Figure 11)
STEP 2:
Set the wall frame onto the gasket. Center it left/right and push it against the wall and mark hole locations for wall fasteners. The gasket will
set the frame at the proper height. (Figure 12)
STEP 3:
Secure frame to the wall with fasteners (not provided). Pull plastic tubing up through the hole in the frame. Use mounting slots that will provide
the proper securing location. Make sure to pull the plastic tubing up through the hole in the frame.
STEP 4:
Slide sponge tubing insulation over water line.
Connect the tubing to the INLET elbow on the
back of the bottle filler assembly. (Figure 13)
STEP 5:
Set the bottle filler
cabinet into place.
MAKE SURE the cabinet
fits into the groove in
the rubber gasket on
both sides and front of
the cabinet wrapper.
(Figure 14)
02/20 | 2000102863_KEPAC-SBF
Figure 11
Make sure to pull
the plastic tubing
up through the
hole in the frame.
REAR VIEW OF BOTTLE FILLER
Figure 14
Figure 12
Use mounting
slots that will
provide the proper
securing location.
Figure 13
Connect tube to elbow
on the valve
Plastic tubing
Sponge tubing insulation
Bottle filler cabinet
Groove in the gasket
13

Publicité

loading