Leggett & Platt performance VIBRANCE Manuel Du Propriétaire page 8

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

STEP 6
Plug electrical power cord into a working, grounded electrical outlet.
Note: An electrical surge protection device is recommended (not included).
STEP 7
Briefly activate all functions of the base with the remote control to verify
all features are in working order. If base does not operate, refer to the
Troubleshooting section of this manual.
STEP 8
Return base to the level position.
STEP 9
Install mattress retainer at the foot end of the base as follows:
a. Locate grommeted holes at foot of base (FIGURE 2).
b. Place mattress retainer ends into grommeted holes in top surface
of adjustable base (FIGURE 2). Press down until horizontal retainer
section is flush against base.
FIGURE 2
STEP 10
Install mattress on adjustable base.
Typical Vibrance™ adjustable base installation is now complete.
8
Vibrance™ Owners Manual 99301542-c
INSTALLATION
MATTRESS
RETAINER

Publicité

Table des Matières
loading

Table des Matières