Start-Up; Menu Structure - Helios ETR Instructions D'installation Et D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation and Operating Specification ETR

7.2 Start-up

Procedure
1. You must mount and connect the device in accordance with the operating instruc-
tions.
2. Double check that all connections are correct.
3. The supply voltage must match the information on the rating plate.
4. Set the mode, unit and measuring range and adjust the sensor in the BASE
SETUP.
5. Set the parameters for control operation for the mode
Information
When saving the operating Mode, the factory settings are stored. Therefore all the
settings you have made before, are lost.

7.3 Menu structure

27.5 °C
Actual Value
Selection of the menu group (e.g. BASE SETUP) to the right through the ▼-key, to the
left through the ▲-key.
Youcangotothemenuitemsinthemenugroups (e.g. mode) by using the P key. Use the
arrow keys to move up and down within the menu group.
To make adjustments, press the P key after selecting the menu item. If the previously set
value starts to flash, it can be adjusted with the ▼+▲ keys and then saved with the P
key. To exit the menu without making any changes, use the "Esc" short-key, i.e., the
originally set values remain.
L-BAL-E293-GB 1841 Index 001
Display after turning on the voltage supply.
Switch over between actual value display and "INFO" with
the key shortcut for Escape (Esc = ▼ + ▲).
Part.-No.
10/19
Programming
under SETTING.
2.01
INFO

Publicité

Table des Matières
loading

Table des Matières