EN
Electric: Half/full power
Water: On/off (1 LED)
Remote control - on/off, fan steps and heating steps
Functional test
Functional test is started using the remote
control.
Push
and
in 5 seconds
Fan and heatings steps are tested in
10-second intervals which is indicated by
lighted LEDs. When the test is completed, all
LEDs will flash for 30 seconds.
20
PAEC3200C
Fan step 1/2/3
Heat step
On/off
Control panel - Unit with electrical heating or water
heating
Fan step 1/2/3
On/off
Control panel - Unit without heating
Temperature control
If the temperature exceeds 50 °C, the fan
runs at full speed for 2 minutes to vent out
the heat, if the temperature rises above
50 °C again during the following 5 minutes
overheating alarm is deployed. The red LEDs
flash and all the buttons are locked.
1. Disconnect the power supply with the
isolator switch.
2. Determine the cause of overheating and
rectify the fault.
3. Reconnect the unit.
~20 °C
3
2
1