Installation - Diehl Metering Aerius Guide D'installation

Compteur de gaz statique
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

AERIUS

4.4 Installation

Installation must be carried out in compliance
with the applicable installation instructions of the
gas utility or the generally applicable safety regu-
lations.
The applicable installation regulations are the
specific national technical guidelines for gas
installation.
Prior to installing the meter:
ƒ
the pipe system must be checked for soiling, e.g. metal
cuttings, welding residues, liquids etc. and cleaned if
necessary.
ƒ
the meter must be checked for signs of external dam-
age before installation.
The meter must be fitted so that it is free from
mechanical stresses.
The fire control valve must not be dismantled.
ƒ
Depending on the type of thread, Teflon tape or a flat
seal suitable for the medium is to be used for sealing.
ƒ
The system must be filled slowly, after which a leak
test must be carried out.
- 26 -
English

Publicité

Table des Matières
loading

Table des Matières