DISPLAY UNIT
▪ Turn the power on at the main
switch below the control panel. Wait
until you see text on the display.
▪ Adjust the machine speed with the
grey knob to desirable speed.
It will take a few minutes for the machine to heat up to its programmed temperature. Wait until the red
7
indicator light is switched off and the green ready indicator light comes on. Now the machine is ready
to start welding.
PUT THE MACHINE IN CORRECT POSITION
▪ The machine is equipped with
separate transportation wheels for
easy transport.
▪ Tip the machine as shown on
picture and easily move it to your
desired location.
OPERATION
1
▪ Select between °C/meter and °F/feet
by pushing the button. The machine
will remember last used setting.
4
▪ Adjust the fan speed with the blue
knob to desirable speed.
1
▪ Align the machine to its correct
position with the overlap edge of the
membrane.
GB
2
5
2
- 6 -
▪ Adjust the temperature with the red
knob to desirable temperature.
▪ Push the fan button to start heating
up the machine. The red wait indicator
will light up.
▪ The adjustable guide wheel and the
welding belt should be in line with the
edge of the overlapped membrane
according to the picture.
3
6
3