Operation - STERWINS 1300 WT 50 SM5I-3 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 1
5. BEFORE FIRST USE
Preparing the discharge line
• The discharge line (min. 19 mm (3/4")) must be connected to the discharge connector
either directly or with the aid of a standard adaptor
• With the right couplings it is also possible to use a 13 mm (1/2") delivery hose. The smaller
delivery hose results in a lower delivery rate.
• During the priming operation, fully open any shut-off mechanisms (spray nozzles, valves,
etc.) in the discharge line so that the air can escape without obstruction.

6. OPERATION

DANGER! Risk of injury due to electric shock.
Warning! Do not plug in before installation is fully completed!
Setting up your pump
• Place the pump on a flat firm surface to ensure safe operation
• Remove the connectors caps
Connecting the intake line
• Screw the standard connector
• Assemble the intake line using a standard connector
assembly is tight enough as a leaking intake line will draw in air instead of water.
• If the water is not so clear, add a filter between the suction connector and intake line.
EN
20151214 SPECIFICATIONS 1300 WT 50 SM5I-3.indd 124
and clamp
12
from the connectors
&
2
3
onto the suction connector
12
12
124
.
11
, and store them.
5
.
5
and clamp
. Make sure the
11
3
14/12/15 12:19

Publicité

Table des Matières
loading

Table des Matières