Installation - Riello RS 300/EV Instructions Pour Installation, Utilisation Et Entretien

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3

Installation

Notes on safety for the installation
After carefully cleaning all around the installation area, and arranging the correct lighting of the environment, proceed with the instal-
lation operations.
All the installation, maintenance and disassembly
operations must be carried out with the electricity
supply disconnected.
DANGER
The installation of the inverter kit must be carried
out by qualified personnel, as indicated in this
manual and in compliance with the standards and
regulations of the laws in force.
WARNING
Notes on safety for the electrical wiring
 The electrical wiring must be carried out with the electrical supply disconnected.
 Electrical wiring must be carried out by qualified personnel and in compliance with the regulations currently in
force in the country of destination. Refer to the wiring diagrams.
 The manufacturer declines all responsibility for modifications or connections different from those shown in the
electrical layouts.
 The electrical safety of the device is obtained only when it is correctly connected to an efficient earthing system,
made according to current standards. It is necessary to check this fundamental safety requirement. In the event
of doubt, have the electrical system checked by qualified personnel.
 The electrical system must be suitable for the maximum input power of the device, as indicated on the label and
DANGER
in the manual, checking in particular that the section of the cables is suitable for the input power of the device.
 For the main power supply of the device from the electricity mains:
- do not use adapters, multiple sockets or extensions;
- use an omnipolar switch with an opening of at least 3 mm (overvoltage category) between the contacts, as
indicated by the current safety standards.
 Do not touch the device with wet or damp body parts and/or in bare feet.
 Do not pull the electric cables.
Installation
After positioning the inverter kit near the installa-
tion point, correctly dispose of all residual packag-
ing, separating the various types of material.
Before proceeding with the installation opera-
CAUTION
tions, carefully clean all around the area where it's
installed.
5
GB
6112

Publicité

Table des Matières
loading

Table des Matières