3. CONSTRUCTION BOX
SEE PLAN 5 -BOX
*PRINCIPAL:
-Put the panels against each other with the help of the dowel pin included. -On the side of the panels there is double sided
tape provided. Remove the strip so that you can stick the sticking side against the adjoining panel. DO THIS ONLY FOR THE
VERTICAL SEAMS, NOT WITH THE SEALING PANELS, this offers the possibility to correct something afterwards.
*BUILDING TOGETHER THE BOX WITH THE PANELS
Assembly sequence panels see PLAN 5 -BOX
-Start by the back corner, once the complete backside is finished you put the First sealing panel on it, keep on building like
this until you reac
the front side.
h
22