Spray PARABOND 600 on the frame and secure the plates for definite.
Drill in the corner of each plate a hole dia 6,5mm and screw this tighten with the round nuts M6 and included side nut.
(bolkopbout M6x20 + gekartelde moer M6)
2. PLACING OF THE RAILS
SEE PLAN 3 -POSITIONING RAILS
*POSITIONING OF THE RAILS
-Place the shelf included on the correct position on the ground. Where comes the coolgroup? Comes 72cm outside the box!!
Is there enough space around the box ?
-Next place the rails. Big holes at the top side. Slide the different pieces rail in eachother. How far comes the wagon when it
19