MS Schippers Dumbox Mode D'emploi page 20

Masquer les pouces Voir aussi pour Dumbox:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

is pulled outside? -Rectify until everything is in the correct position.
AT OPTION DOORHEATING – GRIND GROOVE IN CONCRETE -SEE ANNEX DOORHEATING !
*FIXING FIRST RAIL
-Put the FIRST rail straight and fasten this one.
FIRST fix begin and end point, then the holes in between. Drill the holes through the concrete while the rail is at side. Blow
the dust from drilling out of the holes. Place the plugs (dia 14) and fix the rails with the coach screws M10x100 (box wrench
17)
(coach screw M10x100 + rubber + plug dia 14x90)
*FIXING SECOND RAIL
-Now put the SECOND rail straigth and parallel with the first one. To do this you move the shelf while drilling so that the rails
are perfectly parallel.
-Place the wagon on the rails and check that this one is running perfect.
It can happen that, with badly concrete casting, the wagon drags here and there o rit does not Carry poerfectly on the 4
wheels, look carefully where this happens:
20

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

9990041

Table des Matières