Télécharger Imprimer la page

Speck pumpen BADU Eco Soft Fiche Technique page 17

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 21
1
Power
BADU Pool technologies and solutions.
Notice: When the pump is used with an external control,
the connection to the external control has to be
interrupted or the external control has to be disconnected
from the mains voltage when programming the
performance level and the priming time!
1
Power
BADU Pool technologies and solutions.
Notice: During the suction phase it is not possible to
change the performance level.
07|2017
GREEN
SET
2
3
OK
0
Error
GREEN
SET
2
3
OK
0
Error
Operation:
Press button "1", "2" or "3" to select
the preset performance level.
If the pump starts from a standstill, it
starts up in priming mode and
subsequently with the selected
performance level.
As long as the pump is in the priming
phase, the LED of the selected
performance range flashes.
During running operation the pump is
started up directly to the performance
level, without priming time.
The motor is stopped by pressing the
button "0". The "Power" LED flashes
and the display shows "OFF".
Setting the performance level:
Press the button of the performance
level which is to be changed and
then keep the "SET" button pressed
for at least 3 seconds until the
performance displayed in the display
begins to flash. Now the performance
can be changed with the buttons
"▼ ▲". To save the performance
confirm with "OK". To cancel and
retain the original performance press
the "SET" button.
EN 17

Publicité

loading