Set Panel; Previous Inspections - Key Automation TURBO 30 Livret D'instructions

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 26
4
5
5
6
10
8

PREVIOUS INSPECTIONS

Before the installation starts, we suggest to carry out following inspections and
operations:
1_The gate framework must be strong and suitable.
2_The gate must not show too many sideways slide skids during the running.
3_The system of wheels/lower rail and roller/upper runner must work without too
many frictions.
4_To avoid the gate derailment you must install the stop beats of the sliding,
whether at the opening or closing, and a second upper roller/runner in full
observance of the current law.
5_Remove any manual lock in the beforehand gates.
6_Take on the gate bottom the feed raceway of the feeding cables (Ø25-50mm)
and of external connection (photocell, flash-light, key selector, etc...).
7_System must be protected by a bipolar switch with limit of 30mA.

SET PANEL

7
1
6 4
1
Gear-motor
2
Flash-light
3
Antenna.
4
Key selector
5
Photocell
6
Small columm
7
Rack
8
Limit switch
9
Warning sign
10
Stop locks
9
3
5
8
5
6
6
10
10
GB
2

Publicité

Table des Matières
loading

Table des Matières