Initial operation
7.2
Installation and connection of the smoke switch
Clip on smoke switch.
X
Plug in 24 V cable of the of electrical hold-open device (1) and the power pack (2).
X
Stow away the excess cable into the power pack housing.
X
For additional connections, see the separate document "Instructions for Installation, Commissioning, Operation
X
and Maintenance of the GEZE Hold-Open Device FA GC".
7.3
Adjusting electrical hold-open device
9.
Open door leaf to desired hold-open angle and fix it there (1.).
X
Remove cable protection foils from guide rail (2.).
X
Loosen clamping screws of electrical hold-open device (3.).
X
Move electrical hold-open device until catch contacts (4.).
X
Screw down electrical hold-open device securely (5.).
X
To prevent loops from forming, tighten cable and fasten cable protection at hold open device end (6.).
X
GB 8
TS 5000 R BG
Fig.: 7.2.1
Fig.: 7.2.2
Fig.: 7.3.1