Télécharger Imprimer la page

GEZE TS 5000 ISM BG Mode D'emploi page 11

Masquer les pouces Voir aussi pour TS 5000 ISM BG:

Publicité

Les langues disponibles

Les langues disponibles

TS 5000 ISM BG
Loosen clamping screw (1.).
X
Thread wire cable with wire cable redirection into oblong hole (2.).
X
Thread past the clamping screw and guide out the oblong hole (3.).
X
Tension wire cable firmly and tighten clamping screw (4.).
X
Mount trigger lever (5.).
X
Loosen clamping part again (6.) Screw in set screw (do not tighten lock nut yet!).
X
Shorten wire cable to an excess of 30–50 mm to the outer edge of the guide rail. (7.).
X
6.4
Connect sliding lever of fixed leaf with sliding block
Close closing-time valve.
X
Connect sliding lever to sliding block (tightening torque: 5 Nm).
X
Open closing-time valve again.
X
Mounting and securing
Fig.: 6.3.2
Fig.: 6.4.1
GB 5

Publicité

loading