Maintenance Schedule - Weidmüller Power Stripper Serie Notice D'instructions Originale

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 35
Cleaning and maintaining the machine

7.3 Maintenance schedule

4
2
1
Figure 7.1
Maintenance item overview (Power Stripper 6.0)
Maintenance item
1
2
3
4
5
30
Interval / maintenance activity
Daily
Emptying the waste container
Half-yearly
Cleaning the interior
Wire-holding tongs (rear side of front plate):
Oiling the pivot point and contact areas
Oiling the ball pressure screws
As required
Replacing the stripping blades
5
3
See section
7.4
7.5
7.6
7.7
8.4
2562260000/01/10.2017

Publicité

Table des Matières
loading

Table des Matières