Télécharger Imprimer la page

Kohler K-3493 Mode D'emploi page 6

Publicité

Les langues disponibles

Les langues disponibles

Operation (cont.)
the vessel through the screen and pressure regulator. The water then
flows across the air inducer, which mixes a small amount of air with
the water, filling the vessel until a pressure of approximately 35 psi (2.5
Kg/cm squared) is reached. The toilet will be ready for the next flush
within 60 to 90 seconds. If the toilet is not ready for the next flush
within that time, please refer to the Troubleshooting section.
1044956-5-B
6
Kohler Co.

Publicité

loading

Ce manuel est également adapté pour:

K-3505K-3554