Task 2: Installing The Lcd Panel (Optional) - Promise Technology VessRAID 1000s Serie Guide De Démarrage Rapide

Masquer les pouces Voir aussi pour VessRAID 1000s Serie:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 66
VessRAID 1000s Series Quick Start Guide
Figure 2. VessRAID 1840s rear view
Power Supply
Figure 3. VessRAID 1730s rear view
For a description of the LEDs, see page 16, Figure 14.

Task 2: Installing the LCD Panel (Optional)

The LCD panel mounts to the left ear of the VessRAID enclosure.
1.
Align the connector on the left bracket of the VessRAID enclosure to the
connector on the back of the LCD panel, as shown in Figure 4.
Power Supply
The LCD panel is NOT a hot-swap device. Be sure the
VessRAID is powered down before you connect or disconnect
the LCD panel.
You must install the LCD panel before you mount the
VessRAID subsystem in a rack.
RAID Controller
RAID Controller
Cautions
5

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Vessraid 1730sVessraid 1740sVessraid 1830sVessraid 1840s

Table des Matières