6.1
Screw the 1-1/4" Threaded Studs into the Threaded
Holes on the bottom of the Hanger Bracket with your
fingers (Figure 26) .
6.2
Lift the Ceiling Cover up to the Threaded Studs and
turn until Studs protrude through the Ceiling Cover
Holes (Figure 27) .
Secure the Ceiling Cover in place by sliding a
Lockwasher over each of the Threaded Studs and
installing the two Knurled Knobs (supplied) (Figure 27) .
Tighten the Knurled Knobs securely until the Ceiling
Cover fits snugly against the ceiling and the Hole in the
Ceiling Cover is clear of the Downrod .
WARNING
!
To avoid possible fire or shock, make sure that the
electrical wires are completely inside the outlet box and
not pinched between the ceiling cover and the ceiling.
Figure 26
1-1/4"
THREADED
STUD (2)
#8 EXTERNAL
TOOTH
LOCKWASHER (2)
Figure 27
Please contact 1-800-777-4440 for further assistance
17
HANGER BRACKET
THREADED STUDS (2)
CEILING
COVER
#8-32 KNURLED
KNOB (2)
luminancebrands.com
ETL Model No.: CF444