cecotec ENERGYSILENCE 12000 AIR CLIMA CONNECTED Manuel D'instructions page 39

Masquer les pouces Voir aussi pour ENERGYSILENCE 12000 AIR CLIMA CONNECTED:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 53
ENGLISH
Place the drain hose below the piping, taking care not to create siphons.
The drain hose must slant downwards to aid drainage.
Do not bend the drain hose or leave it protruding or twisted and do not put the end of it in
water. If an extension is connected to the drain hose, ensure that it is lagged when it passes
into the indoor unit.
If the piping is installed to the right, the pipes, power cable and drain hose must be lagged and
secured onto the rear of the unit with a pipe connection.
After having connected the pipe according to the instructions, install the connection cables.
Now install the drain pipe. After connection, lag the pipe, cables and drain pipe with the
insulating material.
1. Arrange the pipes, cables and drain hose well.
2. Lag the pipe joints with insulating material, securing it with vinyl tape.
3. Run the bound pipe, power cables and drain pipe through the wall hole and mount the indoor
unit onto the upper part of the mounting plate securely.
4. Press and push the lower part of the indoor unit tightly against the mounting plate.
Fig. 17.
1.
Vinyl tape cover
2. Insulation sleeve
3. Refrigerant pipe
4. Condensed water drain pipe
5. Probe cable (for heat-pump)
6. Connection cable 1 (for heat-pump)
7.
Connection cable
8. Refrigerant pipe
Mounting plate
Fig.18
Outdoor unit installation
Safety distance for installation (mm)
Fig. 6.
Do not install the outdoor unit near sources of heat, steam or flammable gas.
Do not install the unit in too windy or dusty places.
Do not install the unit where people often pass. Select a place where the air discharge and
operating sound will not disturb the neighbours.
Avoid installing the unit where it will be exposed to direct sunlight (other wise use a protection,
if necessary, that should not interfere with the air flow).
74
ENERGYSILENCE 12000 AIR CLIMA CONNECTED
Reserve the spaces as shown in the picture for air to circulate freely.
Install the outdoor unit in a safe and solid place.
If the outdoor unit is subject to vibration, place rubber gaskets onto the feet of the unit or no
the wall fixings.
The outdoor unit should be installed on a solid wall and fastened securely.
The following procedure must be observed before connecting the pipes and connecting cables:
decide which is the best position on the wall and leave enough space to be able to carry out
maintenance easily.
Fasten the support to the wall using screw anchors which are particularly suited to the type
of wall.
Use a larger quantity of screw anchors than normally required for the weight they have to bear
to avoid vibration during operation and remain fastened in the same position for years without
the screws becoming loose.
The unit must be installed following the national regulations.
Outdoor unit condensed water drainage (only for heat pump models)
Fig. 19.
1.
Drain port
2. Drain pipe
The condensed water and the ice formed in the outdoor unit during heating operation can be
drained away through the drain pipe.
1. Fasten the drain port in the 25-mm hole placed in the part of the unit as shown in the picture.
2. Connect the drain port and the drain pipe.
Make sure that water is drained in a suitable place.
Electrical connections
Fig. 20.
1.
Wiring diagram on the back of the cover
2. Screw
1. Remove the handle on the right-side plate of outdoor unit.
2. Connect the power connection cord to the terminal board. Wiring should fit that of indoor
unit.
3. Fix the power connection cord with wire clamp.
4. Check if the wire has been fixed properly.
5. An efficient earth connection must be ensured.
6. Recover the handle.
Connecting the pipes
Fig. 21.
1.
Connection pipes
ENGLISH
ENERGYSILENCE 12000 AIR CLIMA CONNECTED
75

Publicité

Table des Matières
loading

Table des Matières