Télécharger Imprimer la page

Cooper Lighting Solutions Metalux FP Instructions page 2

Publicité

Les langues disponibles

Les langues disponibles

FP Panel Instructions
For T-Grid Mounting
1.
Turn off the power at the main fuse/breaker box.
2.
Carefully open carton and remove fixture from
packaging.
3.
Locate fixture junction box cover and slide to remove it.
(Figure 1.)
4.
Remove appropriate knockout(s) for power supply
wiring.
Figure 1.
N
ote:
Fixture weights are below. Ensure grid location is
rated for fixture weight before moving to next step.
If unsure use cable to support fixture to appropriate
support beam above fixture using the circular holes in
the corner tabs. (Figure 2.)
2' x 2'
9.4lbs (4.2kg)
9.8lbs (4.4kg)
Figure 2.
5.
Pass fixture through the grid at a 45 degree angle and
lay fixture into the grid. (Figure 3.)
2
COOPER LIGHTING SOLUTIONS
1' x 4'
2' x 4'
18.5lbs (8.4kg)
IB519107EN
Installation instructions
Figure 3.
6.
Grid clips are provided for additional retention to ceiling
system. Orient 4 tabs on back of fixture over T-GRID
by bending tabs up 90 degrees perpendicular to back
of fixture. Next bend tabs 90 degrees towards T-GRID
frame. (Figure 4.)
Figure 4.
7 .
Using the open knockout bring in the supply line. Using
the three provided wire nuts to attach the ground wire
to the ground supply wire, the black (line) wire to the
black supply wire, and the white (neutral) wire to the
white supply wire. (Figure 5.)
Supply
Route wire
through open KO
(not pictured).
Ground
Figure 5.
Wire Nuts (3)
Black
For Battery
Backup,
Access LED
Wires Here

Publicité

loading