Axis T99A11 Mode D'emploi page 21

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 39
AXIS T99A11 Positioning Unit 24 V AC/DC
1
Power cable (not included)
2
Strain relief
3
Grounding screw
4
Grounding braid (not included)
5
Bottom cable hole
1. Install the optional conduit adapters (not included).
2. Connect the grounding braid to the grounding screw.
3. Insert the power cable, I/O cable and network cable through the hole in the base unit as
shown in the illustration above. Alternatively insert them through the bottom cable hole.
4. Insert the power cable through the strain relief with a distance of 530 mm (21 in) from
the strain relief to the end of the cable.
21
EN

Publicité

Table des Matières
loading

Table des Matières