Health O Meter Professional 600KL Instructions De L'utilisateur page 8

Masquer les pouces Voir aussi pour Professional 600KL:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

ASSEMBLY INSTRUCTIONS (CONT.)
4. Plug the load cell cable connector into the
load cell plug in the platform base. The
base of the scale has been designed to
provide wire management for the load cell
cable. Route the load cell cable as shown.
5. After plugging in the load cell cable, slide
the section of plastic tubing surrounding the
cable upwards.
6. Tuck the cable and tubing into the
protective guide in the underside of the
scale platform. This holds the cable in place
and protects it from being damaged.
P/N UM600KL_600KG_Rev20181214_Web
plastic tubing
tuck into
protective
guide
8
Load cell cable port

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Professional 600kg

Table des Matières