Mounting Main Enclosure Assembly - peerless-AV FPEWM Installation Et Montage

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Mounting Main Enclosure Assembly

• Do not lift more weight than you can handle. Always use an assistant or mechanical lifting equipment to safely lift
and position the flat panel screen.
• Do not tighten screws with excessive force. Overtightening can cause damage to mount. Tighten screws to
40 in. • lb (4.5 N.M.) maximum torque.
Insert two M10 x 16 mm socket screws (C) and
3
two split lock washers (D) into bottom of wall box
(A) leaving 1/4" exposed thread as shown in figure
3.1 and detail 1.
Hook tilt plate (B) onto bottom socket screws
threaded into wall box (A) and select desired tilt
angle (0° to 20°) as shown in figure 3.2. NOTE: Be
sure split lock washer (D) is on outside of tilt plate
as shown in detail 2.
Insert two M10 x 16 mm socket screws (C) and
two split lock washers (D) through tilt plate (B)
and into top of wall box (A) as shown in figure 3.3.
Tighten all fasteners using 6 mm allen wrench.
CAUTION
• Do not allow main enclosure assembly to hang freely
on wall box (A) when all four sets of M10 x 16 mm
socket screws (C) are not fully secured or mount may
come off of wall.
MAIN ENCLOSURE
ASSEMBLY
B
A
DETAIL 2
fig 3.2
WARNING
C
DETAIL 1
TILT PLATE
D
6 of 21
All other brand and product names are trademarks or registered trademarks of their respective owners.
D
fig. 3.1
1/4"
ISSUED: 08-09-10 SHEET #: 061-9057-6 07-08-15
© 2015, Peerless Industries, Inc. All rights reserved.
C
fig 3.3

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Fpewm-b

Table des Matières