Start the appliance according to instructions for use.
-
Control that the appliance does not leak.
-
Control combustion safety in the regulation range by passing from maximum to
minimum
-
Control that the regulation of the pilot flame is correct (use of correct injectors).
-
Control progressive ignition and correct regulation of main burner flames.
2.4. COMMISSIONING AND TESTING
Once all the connections have been made, the appliance and the overall installation
must be checked following the directions given in this manual.
Check in particular:
That the protective film has been removed from the external surfaces;
that connections have been made in accordance with the requirements and
directions indicated in this manual;
that all safety requirements in current standards, statutory regulations and
directives have been met;
that the water and gas connections are leak-free;
that the electrical connection has been performed according to standards.
Now the appliance can be ignited following the instructions for use and controlling the
following points:
-
Progressive ignition of the burner;
-
even flames;
-
flame security: check these points at both minimum and maximum output.
Check that the flue gas exhaust is not clogged and that they are expelled without any
hindrance.
The test report must be completed in full and submitted to the customer who should
then sign in acceptance. With effect from this moment, the appliance is covered by the
manufacturer's warranty.