2.2.2. CONNECTION TO WATERWORKS
-
Water inlet pressure must be between 50 and 300 kPA, otherwise a pressure regulator
must be installed before the appliance.
-
A water tap is connected to the appliance.
-
The water connection must be in conformity with the Water Act 1086 - Model bylaws.
2.2.3. GAS CONNECTION PROCEDURES
The choice of the gas piping depends on the diameter required for the type of gas,
appliance and installation and should be performed in conformity with current
regulations.
The gas feed plant can either be fixed or be disconnected; if flexible pipes are
employed they must be made from stainless material and not be affected by corrosion.
If sealing materials are used for connections, they must be certified and approved for
the purpose.
The gas fitting is located on the lower right side of the appliance
Once the appliance has been connected, carry out a leakage test on all the fittings
connecting the appliance to the plant. It is advisable to use a leakage spray, otherwise
treat the parts with a foam that does not produce corrosion; no bubbles should
develop. Carry out the leakage test also on the rapid cut-off valve.
Warning! : Flames are strictly prohibited for leakage tests!