INSTALLING THE Rn2SL (Cont.)
7. Insert the Rn2SL with Rubber Sleeve in the suction pipe as far as it
can penetrate.
9. Insert the Discharge Pipe (item 7 not provided) into the Flexible
Coupling and tighten the Hose Clamp.
DO NOT directly connect to building structure.
8. Wrap the Metal Bracket Hose Clamp around Flexible Coupling, but do
not tighten it.
5