Installation and start-up of KEOR HPE UPS 60÷80 kVA
Installation et démarrage de l'ASI KEOR HPE 60÷80 kVA
Installazione e avviamento KEOR HPE UPS 60÷80 kVA
15) On Level no. 6, insert tray no. 17 in compliance with the position and cabling as demonstrated
in Picture 22.
Picture 22 - View from above Level No.6 tray no. 17
16) Insert tray no. 16 by removing the circled jumper and inserting the jumpers as demonstrated in Figure 23.
NOTES: on tray 16 check the circled jumper is not connected,
leave the circled jumper disconnected.
Picture 23 - View from above Level No.6 trays no. 16-17
OMW07096 REV. E
47