Télécharger Imprimer la page

LEGRAND KEOR HPE 60 Manuel De Fonctionnement page 70

Publicité

Les langues disponibles

Les langues disponibles

Installation and start-up of KEOR HPE UPS 60÷80 kVA
Installation et démarrage de l'ASI KEOR HPE 60÷80 kVA
Installazione e avviamento KEOR HPE UPS 60÷80 kVA
11) On level no.4, insert trays no 10-11-12 in compliance with the position as demonstrared in Picture 18.
NOTES: On trays no. 10 and no. 12 check the circled jumper are not connected,
leave the circled jumper disconnected.
Picture 18 - View from above Level No.4
12) Wire the level as indicated in Picture 19. Leave the circled jumpers disconnected.
Picture 19 - View from above Level No.4 with battery connections
OMW07096 REV. E
45

Publicité

loading

Ce manuel est également adapté pour:

Keor hpe 80