Télécharger Imprimer la page

LEGRAND KEOR HPE 60 Manuel De Fonctionnement page 68

Publicité

Les langues disponibles

Les langues disponibles

Installation and start-up of KEOR HPE UPS 60÷80 kVA
Installation et démarrage de l'ASI KEOR HPE 60÷80 kVA
Installazione e avviamento KEOR HPE UPS 60÷80 kVA
7) On Level no. 2, insert trays no. 4-5-6 in compliance with the position as demonstrated in Picture 14.
NOTES: On trays no. 4 and no. 6 check the circled jumper are not connected,
leave the circled jumper disconnected.
Picture 14 - View from above Level No.2
8) Wire level no. 2 as indicated in Figure 15. Leave the circled jumpers disconnected.
Picture 15 - View from above Level No.2 with battery connections
OMW07096 REV. E
43

Publicité

loading

Ce manuel est également adapté pour:

Keor hpe 80