Télécharger Imprimer la page

Publicité

Les langues disponibles

Les langues disponibles

Installation and start-up of KEOR HPE UPS 60÷80 kVA
Installation et démarrage de l'ASI KEOR HPE 60÷80 kVA
Installazione e avviamento KEOR HPE UPS 60÷80 kVA
Do not modify the device
Do not modify the device in any way: this may result in damage to the equipment itself as
well as to objects and persons. Maintenance and repair must be carried out by authorized
personnel only. Contact the manufacturer for details of the nearest service centre.

2.3.5 Electrical connection

The UPS connection to the AC power must be carried out in compliance with the current regulations.
Make sure the indications specified on the identification plate correspond to the AC power system and
to the actual electrical consumption of all of the equipment connected.
Check the conformity to the Standards
The UPS must be installed in compliance with the standards in force in the country of
installation.
IT system
The UPS is also designed to be connected to an IT power distribution system.
All the electrical connections must be carried out by authorized personnel. Before connecting the device
make sure that:
 the connection cable to the AC line is properly protected;
 the nominal voltages, the frequency and the phase rotation of the AC supply are respected;
 the polarities of the DC cables coming from the battery have been checked;
 no leakage current to earth is present.
The device is connected to the following voltage supplies:
 DC battery voltage;
 AC mains voltage;
 AC bypass voltage.
OMW07096 REV. E
19

Publicité

loading

Ce manuel est également adapté pour:

Keor hpe 80