Installation and start-up of KEOR HPE UPS 60÷80 kVA
Installation et démarrage de l'ASI KEOR HPE 60÷80 kVA
Installazione e avviamento KEOR HPE UPS 60÷80 kVA
9) On Level no.3, insert trays no. 7-8-9 in compliance with the position as demonstrated in Picture 16.
NOTES: On trays no. 7 and no. 9 check the circled jumper are not connected,
leave the circled jumper disconnected.
Picture 16 - View from above Level No.3
10) Wire the level as indicated in Picture 17. Leave the circled jumpers disconnected.
Picture 17 - View from above Level No.3 with battery connections
44
OMW07096 REV. E